JISE. Request a Quote
Four-Way Shuttle Racking · AGV/AMR Racking OEM

Dense storage racking, engineered for the robot era.

JISE designs and manufactures four-way shuttle racking systems and robot-compatible racking for the world's leading AMR integrators — 40,000 tons of annual capacity, independent AS 4084 / FEM / RMI test reports, and projects delivered across 15+ countries.

40,000 t
annual racking production capacity
2M+
robot-compatible tote locations delivered overseas
15+
countries with completed JISE installations
84
granted patents — 32 invention patents among them

Two specializations, one factory.

We do not try to sell every rack to every market. JISE focuses on the two categories where engineering depth decides the outcome.

Four-way shuttle racking system
DENSE PALLET AUTOMATION

Four-Way Shuttle Racking Systems

Fully automated high-density pallet storage engineered to FEM 10.2.19 — the design code written specifically for shuttle racking. Track record up to 32 m high-bay, 24,000+ positions per project.

Explore the system →
AGV and AMR compatible racking
WHITE-LABEL FOR ROBOTICS

AGV / AMR Racking OEM

Robot-compatible racking manufactured to the robot OEM's interface drawings — 2 million+ tote locations delivered for global integrators' projects in Poland, Korea, the UK and Australia.

OEM cooperation →

Proven on four continents.

A selection of delivered projects. Full case library includes system type, position counts and scope.

Poland — 890,000+ Tote Locations, Goods-to-Person (P3 Project)
POLAND · ROBOT-COMPATIBLE TOTE RACKING (GOODS-TO-PERSON)

890,000+ tote locations

E-commerce fulfillment / warehouse robotics — Manufacture + installation by JISE teams.

Read case →
Thailand — 32 m Four-Way Shuttle High-Bay, 24,000+ Pallet Positions
THAILAND · FOUR-WAY SHUTTLE RACKING, 32 M HIGH-BAY

24,000+ pallet positions

Automotive manufacturing — Design, manufacture + installation.

Read case →
Mexico — 25 m Four-Way Shuttle System, 56,000+ Positions for Megvii
MEXICO · FOUR-WAY SHUTTLE RACKING, 25 M

56,000+ positions

E-commerce / retail distribution — Manufacture + installation.

Read case →

Browse all project cases →

Compliance you can put in front of an auditor.

JISE racking is verified against the standard your market actually enforces — with independent test reports, not self-declarations. Project-specific calculations and stamped FEA reports are issued by our structural engineers, in the official language of your project location.

  • AS 4084 — independent test report series 24111305 + Certificate of Conformity
  • FEM 10.2.02 / EN 15512 — design basis for Europe, Middle East & Asia
  • RMI MH16.1 / MH16.5 — US-standard component test reports
  • CE & TÜV — product certification for EU delivery
  • ISO 9001 / 14001 / 45001 — certified management systems

JISE automatic powder coating line
JISE automated beam production line

35,000 m² of factory behind every quote.

Cold-formed profiles rolled from Baowu steel on automated lines with sub-millimeter length tolerance. Fully automatic electrostatic powder coating: 60–80 µm epoxy film, GB/T 9286 Grade 0 adhesion, 500+ hour salt-spray resistance.

  • 40,000 t/year capacity — 3,500 t per month
  • Own installation crews with overseas project track record
  • Factory-direct OEM — white-label programs for distributors & integrators

About JISE →  Quality & certifications →

From RFQ to sign-off, in six steps.

What you receive at each stage — and how long it takes. The same sequence on every JISE export project.

STEP 1

Inquiry

Send five inputs — warehouse dimensions, pallet spec & weight, target positions, temperature, destination. An engineer, not a sales layer, picks it up within 8 working hours.

STEP 2

Layout & budgetary price — 2 working days

Concept layout drawings plus a budgetary quotation, so you can test the business case before spending on detail engineering.

STEP 3

FEA calculation file

Project-specific structural calculations and a stamped FEA report to your market's code — AS 4084, FEM/EN or RMI — in your project's official language.

STEP 4

Contract production — 20–45 days

Roll-forming, robotic welding and automatic powder coating on our own lines in Dongtai. Production photos and progress updates throughout.

STEP 5

Trial assembly & QC

Critical bays are trial-assembled in the factory before packing. Containers are loaded in erection order with bay-labelled bundles — loading plan shared before shipment.

STEP 6

Installation & acceptance

JISE overseas crews install or supervise local teams. Handover includes as-built drawings, capacity tables and load signage — the file your annual auditor will ask for.

Get a project quotation within 48 hours.

Send us your warehouse dimensions, pallet spec and target location count — our engineers reply with a layout proposal and budgetary price.

Request a Quote →